|
|
|
2 Elements Demolition Equipment Change Equipment Standard Equipment Demolition in 2 Parts | Description
- Making a right arrow from the arrow of origin.
- Modification of existing pipes by the arrow.
- Making a full swing.
- Plastic piping systems for power cylinder bucket.
|
| |   Editing an original boom in right boomWithout providing the balance |
|  Articulated boom demolition mini-excavator Description
- Allows the use of equipment in standard version and demolition.
- Increases height performance .
- Articulation and mechanical locking.
|
|   Modification of 2 equipment to integrate a system boom attached hydraulic or mecanic lock Description
- Dismantling of the original equipment.
- Cutting of the two boom after lifting cylinders boom.
- Strengthening the boom foot.
- Adaptation of a system of quick boom up boom.
- Adaptation of mechanical fastening system corresponding boom on the nose boom.
- Modification of the piping system with standard hydraulic coupling in the attached boom.
- Make a bridge with support for the standard equipment (nose boom with dipper).
- Supply and assembling of the line for small flow rotation.
- Making a stand with gateway to receive the standard equipment (nose boom with dipper).
- Making a stand with gateway to receive the demolition equipment.
|
|
|
|
|
|